29G Aquarium โ€” October 2025 Recap

Tank stabilization and routine maintenance month. Baseline parameters established before BBA treatment campaign.

๐Ÿงช Water Parameters

  • Nitrates maintained: 15-20 ppm range throughout month
  • Consistent weekly water changes: 75% display / 90% sump
  • pH stable at 7.2-7.4
  • Temperature: 76-78ยฐF

๐Ÿ’ง Water Changes & Maintenance

  • Weekly 75% display / 90% sump water changes
  • Regular glass cleaning and overflow maintenance
  • Purigen regenerated mid-month
  • Filter sponges rinsed in tank water

๐ŸŒฑ Plant Health

All plants showing healthy growth with no major issues. Some early signs of BBA beginning to appear on Anubias leaves and around filter intake, but still minimal. Stem plants growing actively with regular trimming required.

๐Ÿงต Algae Status

First signs of BBA appearing on:

  • Anubias leaf edges (minor spots)
  • Filter intake hardware
  • Areas of highest flow

Decision made to begin targeted treatment in November rather than let it establish further.

๐Ÿฝ๏ธ Feeding Routine

Standard feeding schedule maintained throughout October:

  • Daily flake feedings for community fish
  • Algae wafers 3x per week for bottom feeders
  • Occasional frozen foods (brine shrimp, bloodworms)

Note: This schedule was later optimized in November to the current rotation.

๐ŸŸ Fish Health & Behavior

All fish species showing:

  • Active swimming and normal behavior
  • Good coloration and appetite
  • No signs of disease or stress
  • Established territories and schooling patterns

๐Ÿ“Œ Key Observations

  • Tank running smoothly with established bio-filtration
  • Cleanup crew (snails and shrimp) active and healthy
  • Early BBA detection prompted plan for November treatment
  • Flow patterns identified as potential BBA contributor
  • System stable and ready for optimization

๐ŸŸข End-of-Month Status (Oct 31, 2025)

  • Nitrates: 18 ppm
  • Overall Health: Excellent
  • BBA Status: Early stages, minimal coverage
  • System Status: Stable baseline established
  • Next Steps: Begin targeted BBA treatment in November